Skip to content
Shuchi Healthcare Consultancy

Hospital Planning and Design for NABH Compliance

We work with your architect to turn the service plan into a layout that meets NABH standards and licensing rules from day one — correct department adjacencies, clean and dirty flows, infection control zoning, OT and ICU design, fire escape and medical gas planning. It is far cheaper to get this right on paper than to rebuild later.

Key factsVerified 19 October 2026
We work with
Your architect, MEP consultant and contractor
Focus
Flows, zoning and room requirements that NABH and licensing authorities check
Deliverable
Space programme, adjacency diagram and drawing reviews at each stage
Covers
Hospitals, AYUSH hospitals, Panchakarma centres, dental clinics and labs

What we plan

  • Space programme — every room the services need, with indicative sizes.
  • Adjacencies — emergency next to imaging and OT access, ICU close to OT, labour room linked to the newborn area, CSSD serving OTs.
  • Flows — separate patient, visitor, staff, clean supply, dirty return and waste routes.
  • Infection control zoning — OT zones, isolation rooms, hand-wash points, finishes that can be disinfected.
  • Critical areas — OT and ICU layouts with provision for air handling, medical gases and power back-up.
  • AYUSH specifics — Panchakarma therapy rooms with drainage, steam and oil handling, separate male and female therapy areas, medicine preparation areas.
  • Dental specifics — chair spacing, a CSSD with one-way flow, radiation shielding for X-ray, OPG and CBCT.
  • Safety — fire compartments and escape routes, horizontal evacuation for non-ambulant patients, medical gas manifold and cylinder storage.

How we work with your architect

We start with a written space programme, review concept and working drawings against NABH and licensing requirements, and flag issues before construction — when changes still cost little.

Frequently asked questions

Can you work with our existing architect?

Yes. We do not replace your architect; we give them a healthcare space programme and review drawings at each stage against NABH, infection control, fire and licensing requirements.

Which design mistakes cause NABH problems later?

The common ones are CSSD without a one-way dirty-to-clean flow, OTs without proper zoning or air-handling provision, too few hand-wash points, no space for biomedical waste holding, no patient-friendly evacuation route from ICUs, and pharmacies or stores without temperature control.

Get a free gap assessment for your facility

Tell us your facility type, bed or chair count and city. Dr. Ashutosh Sharma will tell you which NABH programme fits, what it will cost and how long it will realistically take — before you commit to anything.

WhatsApp Call now